The Shareholders Hindustan Copper Ltd Kolkata
Your Directors have pleasure in presenting the fifty sixth Annual
Report of Hindustan Copper Ltd (HCL/the Company) together with the audited statement of
accounts and Auditors' Report thereon for the year ended 31.3.2024.
1. Performance
Financial Summary or highlights
The comparative working results for the FY 2023-24 vis-a-vis FY 2022-23
are as under:
(Rs in crore)
Particulars |
2023-24 |
2022-23 |
(a) Sales |
1686.51 |
1660.63 |
(b) Profit /(Loss) before depreciation, amortization, finance
cost & tax (EBITDA) |
601.42 |
586.51 |
(c) Less: Depreciation & Amortization |
174.87 |
174.92 |
(d) Less: Finance Cost |
16.12 |
15.93 |
(e) Profit/ (Loss) Before Tax from continuing operation |
410.43 |
395.66 |
(f) Profit/(Loss) Before Tax from discontinuing operation |
- |
- |
(g) Profit/(Loss) Before Tax from continuing &
discontinuing operation |
410.43 |
395.66 |
(h) Less: Provision for Taxation Net (Current & Deferred
Tax) |
115.02 |
100.35 |
(i) Profit after tax from Continuing & Discontinuing
Operation |
295.41 |
295.31 |
(j) Other Comprehensive Income (net of tax) |
(7.33) |
(9.57) |
(k) Total Comprehensive Income for the year |
288.08 |
285.74 |
(l) Add: Balance brought forward from the previous year |
822.25 |
648.68 |
(m) Balance available for appropriation |
1110.33 |
934.42 |
(n) Less: Dividend |
88.97 |
112.17 |
(o) Balance to be carried forward |
1021.36 |
822.25 |
(p) Earnings per Share (Rs ) (Both Basic & Diluted) |
3.06 |
3.05 |
During 2023-24, the Sales of the Company was Rs 1686.51 crore as
against Rs 1660.63 crore during FY 2022-23 registering an increase of 1.56%. The Company
posted Profit Before Tax from continuing & discontinuing operation of Rs 410.43 crore
during the year as against Rs 395.66 crore recorded during the previous year registering
an increase of 3.73%. The Profit After Tax from continuing & discontinuing operation
during FY 2023-24 was Rs 295.41 crore as against Rs 295.31 crore in FY 2022-23. The total
borrowing of the Company was Rs 222.46 as on 31.3.2024 as against Rs 156.39 crore as on
31.3.2023.
Physical performance
The comparative physical performance of production and sales for the
year 2023-24 vis-a-vis 2022-23 is as under:
Particulars |
Unit |
2023-24 |
2022-23 |
Ore |
Lakh Tonnes |
37.82 |
33.47 |
Metal in concentrate (MIC) |
Tonnes |
27,404 |
24,760 |
Cathode |
Tonnes |
Nil |
7 |
CC Wire Rod - Tolling Production |
Tonnes |
27,833 |
6,558 |
Sales: Cathode MIC |
Tonnes |
Nil 25,630 |
79 24,640 |
Total Sales |
|
25,630 |
24,719 |
During FY 2023-24, Malanjkhand Copper Project (MCP) unit of the Company
had achieved ore production of 2.55 Million tonne which was 106% of the target and 18%
higher than FY 2022-23. Khetri Copper Complex (KCC) unit of the Company had achieved ore
production of 1.23 million tonne which was 103% of the target and 11% higher than FY
2022-23.
The production of Metal in Concentrate (MIC) at 27,404 tonnes during FY
2023-24 was 11% higher than MIC production of 24,760 tonne in FY 2022-23. Though MIC
production during the year has shown incremental improvement compared to last year, the
performance was below the target set for the year due to suspension of production at Surda
Mine in Ghatsila on account of non-execution of mining lease deed by the State Government
of Jharkhand. The MIC production at KCC was also impacted due to continued water shortage
and power outage notified by the Government of Rajasthan.
Though the Government of Jharkhand had extended the Surda Mining Lease
for another period of twenty years i.e. up to 31.3.2040 vide order dated 6.1.2022, however
the execution of lease deed is pending for want of Stage-I FC over balance 65.52 ha forest
area within mining lease and subsequent amendment in EC grant area from 323.16 ha to
388.68 ha. The MOEF&CC, New Delhi has granted Stage-I FC over balance 65.52 ha forest
area on 15.6.2024 and the same has been submitted to EC division of MOEF&CC for early
issuance of amended EC.
Cathode and CCR production (Own) remained suspended during the year due
to business decision for direct sale of Copper Concentrate. The Taloja Copper Project
(TCP) unit of the Company however produced 27,833 tonnes of CCR (third party tolling) in
FY 2023-24 which is higher by 21,275 tonne as compared to 6,558 tonne produced in FY
2022-23.
HCL had achieved Capex of Rs 518.14 crore against the target of Rs 350
crore in FY 2023-24.
The Company added 66.59 million tonnes of Copper Ore in its reserves
and resource base during FY 2022-23 and as on 1.4.2023, the total Reserve & Resource
of Copper Ore within HCL's mining leases was 698.44 million tonnes of ore with average
grade of 0.96% copper.
To further augment production performance, the Company is taking all
required measures including the following:
- EC amendment for total mining lease area from MoEF&CC, New Delhi
and execution of Surda Mining Lease deed from Government of Jharkhand to commence ore
production from Surda Mine.
- The Contractor engaged for Banwas mine at KCC has been asked to
ensure availability of equipment for achievement of targeted ore production.
- Regular review of contractor's performance is being carried out by
the mining units.
- Apron conveyor parts lowering has been completed before scheduled
time and assembling and associated civil works are in progress. On completion, Kolihan
Mines at KCC will enhance ore production by 12,000 to 15,000 tonnes per month.
- Regular preventive maintenance of Ore hoisting system is being
ensured at Kolihan Copper mine at KCC.
- To overcome the problem of water shortage at KCC, the Company has
taken up the matter with the State
Government of Rajasthan to increase the supply of water at KCC from
Kumbharam project and measures are also being taken for enhancement of rainwater storage
& retaining capacity, improvement of internal water circulation system to reduce loss
of water, enhancement of water reclamation from tailing dam. Further Nagar Palika, Khetri,
Government of Rajashthan is constructing Sewage Treatment Plant (STP) at KCC which is
nearing completion stage. The company has already entered into an agreement with State
Govt. to receive 1 MLD treated water from aforesaid STP which is expected to start in next
Financial Year.
- Concentrator plant at MCP unit will prepare a summary of major
breakdowns that occurred in FY 2023-24 and analyses the pattern of such breakdowns for
improving the performance of concentrator plant.
- Alternative option for Continuous cast wire rods (CCR) production at
TCP unit i.e. third-party tolling of cathodes to CCR production.
2. Dividend
The Board of Directors of your Company has recommended payment of
dividend equivalent to 18.40% on paid-up capital of the Company i.e. Re 0.92 per share on
Rs 5 face value for the year 2023-24 for approval of shareholders in the Annual General
Meeting. The outgo on this account will be Rs 88.97 crore approx.
3. Material Changes, if any
No material changes and commitment, affecting the financial position of
the Company occurred between the end of the financial year to which the financial
statements relate and the date of the report.
4. Projects
The Company is targeting to enhance the ore production capacity to
12.20 MTPA by FY 2028-29. The status of different continuing mine expansion projects is as
under:
i. Malanjkhand Mine (Madhya Pradesh)
The ongoing capacity expansion project i.e. development of underground
mine below the existing open cast mine at Malanjkhand Copper Project (MCP) will augment
the ore production capacity from 2.5 MTPA to 5.0 MTPA. The ore production from open cast
mine has now exhausted and underground mine is operating below the existing open cast mine
leaving some barrier pillar. The project has achieved seamless transition from open cast
mine to underground mine in FY 2023-24 with ramping-up of ore production from Malanjkhand
Underground mine to 22.48 Lakh tonne which is about 60.8% increase with respect to
previous FY 2022-23. Further, for continuity of ore production, two more Mine development
contracts for both North and South Sections of the Underground
MCP Mine have been awarded.
To complete the residual work of underground mine construction for
capacity expansion, a consultancy contract was entrusted on M/s MECON, a reputed CPSE
Consultancy Organization, for estimation of value of residual work, preparation of NIT
document and evaluation of tenders which have been divided in multiple parts (Mine
Excavation at North Side, Mine Excavation at South Side, Shaft Furnishing, Men &
Material Hoisting system, Crushing & Pumping system, Power system, Main Mechanical
Ventilator) to complete the work in an efficient manner. Out of the above multiple parts,
the contracts for completion of mine development work at North & South side have been
awarded and started in FY 2022-23 and development work is under progress.
The contract awarded for construction of 3.00 MTPA Paste Fill Plant for
back-filling the voids of underground mine at MCP to the EPC contractor (M/s Shapoorji
Pallonji and Company Private Ltd) is under progress and the construction work is expected
to be completed by June/ July, 2024. The contract for other enablers of paste fill plant
i.e. transport of paste from surface to underground mined out stope - (underground
distribution system); surface bore hole drilling; operation and maintenance work etc. has
also been awarded and the work is under progress.
The Company has also installed underground mine communication system
using leaky feeder cable with traffic management system at Malanjkhand Copper Underground
mine. This will enhance safety and productivity of mine.
ii. Khetri & Kolihan Mine (Rajasthan)
The proposed expansion of mines at western sector would increase ore
production capacity from existing 1.0 MTPA to 3.0 MTPA. Mine-wise status is as under:
a. Kolihan Mine: Shaft sinking and creation of ore handling facilities
below 0 mRL (meter Reduced Level) has been undertaken to augment the production capacity
to 1.5 MTPA for which EC is already in place. The study report of Geophysical Exploration
work, taken up in FY 2021-22, has shown possible extension of ore body up to -300mRL.
Based on the outcome of above work, the validation drilling has been taken up which
confirmed the continuity of ore body extension up to (-) 300mRL, i.e. about 750m vertical
depth. Scheme of detailed exploration work is under preperation. Further, new contracts
for Production & Definition Drilling has also been awarded to M/s EF Mining.
b. Khetri mine: Execution of the earlier awarded contract to augment
ore production capacity at the mine from 0.5 MTPA to 1.5 MTPA through deepening of
existing shafts and other related activities, could not be completed due to extremely bad
ground / fault zone encountered and as a result the contract had to be terminated. To
sustain the ore production from mine, another contract has been awarded for conversion of
track mining to trackless mining at 0 mRL and below in September, 2022 and the work is
under progress. For Banwas deposit of Khetri Mine, Company appointed the contractual
agency which has produced 415808 tonne of ore in FY 2023-24. Further a depth exploration
of 58000 drilling meterage has been taken up to prove the continuity ore body extension
upto (-) 300 mRL and estimation of reserve at deeper level.
iii. Surda Mine (Jharkhand)
The plan envisages sinking of shaft, deepening of various winzes to
increase production capacity from 0.4 MTPA to 0.9 MTPA in Surda mine. The validity of
Surda Mining Lease has been extended till 31.3.2040 by the Government of Jharkhand. EC was
granted by the Ministry of Environment, Forest and Climate Change (MoEF&CC), Delhi for
0.9 MTPA ore production over 323.16 ha on 30.5.2022. Subsequently, for execution of Mining
Lease deed, the Government of Jharkhand intimated to submit EC over total lease area i.e.
388.68 ha. Accordingly, the EC amendment application was made to MoEF&CC, Delhi. On
28.11.2022 MoEF&CC recommended amendment in EC area from 323.16 ha to 388.68 ha
subject to grant of Stage-I Forest Clearance (FC) over balance 65.52 ha forest area within
Surda mining lease. The MOEF&CC, New Delhi has now granted Stage-I FC over balance
65.52 ha forest area on 15.06.2024 and the same has been submitted to EC division of
MOEF&CC for early issuance of amended EC.
iv. Re-opening of closed mines at Indian Copper Complex (ICC) Ghatsila
(Jharkhand)
The Company has initiated action to re-open the closed mines,
development of new underground mine at Singhbum Copper Belt of ICC namely, Kendadih and
Rakha mines. Mine-wise status is given below:
a. Kendadih mine: Kendadih mine was reopened in December, 2017 with
commissioning of winders after completion of mine-dewatering. The Production and mine
development contract was awarded on 6.7.2021. The development activities and ore
production were started, but the performance of the contract was not satisfactory and as a
result the said contract was terminated on 25.5.2023. The extension of mining lease period
(expired on 2.6.2023) is under progress with the Government of Jharkhand. Further,
application for grant of Stage I FC over remaining forest area within mining lease has
been accepted by Project Screening Committee (PSC)-I. The site inspection by various
authorities of the State Forest department has been completed and the meeting of PSC-II
was held on 30.5.2024 which has recommended the proposal to PCCF (Nodal) on 31.5.2024.
PCCF (Nodal) recommended the proposal to Principal Secretary, Forest, Government of
Jharkhand on 21.6.2024. Further recommendation of Principal Secretary, Forest, Government
of Jharkhand to MoEF&CC, New Delhi is awaited.
b. Rakha mine: Rakha Mining Lease expired on 28.8.2021 and extension of
mining lease period is under progress with the Government of Jharkhand. Further, the
application for grant of Stage-I FC over remaining forest area within mining lease has
been accepted by Project Screening Committee (PSC)-I. The site inspection by various
authorities of State
Forest department has been completed and the meeting of PSC-II was held
on 30.5.2024 which has recommended the proposal to PCCF (Nodal) on 31.5.2024. PCCF (Nodal)
recommended the proposal to Principal Secretary, Forest, Government of Jharkhand on
21.6.2024. Further recommendation of Principal Secretary, Forest, Government of Jharkhand
to MoEF&CC, New Delhi is awaited.
Further, for engagement of MDO (Mine Developer cum Operator) for
re-opening and expansion of Rakha Copper Mine, development of a new underground mine at
Chapri Block to produce 3-00 MTPA of ore and erection & commissioning of a matching
capacity new Concentrator Plant at ICC, the Company has web-hosted tender in MSTC platform
again in the month of May, 2024.
Exploration:
During FY 2023-24 the focus on exploration has been enhanced
considerably to assess depth extension of the ore bodies in different leases of HCL as
well as to enhance copper ore inventory of the Company. Budget for exploration has been
enhanced to Rs 55 crore which is highest since last 10 year's expenditure on this head.
During FY 2023-24, 25385 meter of surface drilling and 24443 meter of
underground definition drilling have been completed in different leases. Extension of ore
bodies has been proved up to about 650 m vertical depth in Rakha Block and up to about 750
m vertical depth in Kendadih Block by taking up General (G2 level) exploration. General
(G2 level) exploration is also in progress for the adjacent Sidheswar Block. Validation
drilling at Kolihan Mining lease, has confirmed the continuity of ore body extension up to
(-) 300mRL, i.e. about 750m vertical depth which was predicted during geophysical survey.
As on 1.4.2023, copper ore reserve and resources of the Company was
698.44 million tonnes with 0.96% of Cu. It is expected that the exploration activities
taken up during the financial year will enhance copper ore reserve and resources of the
Company.
The geological drilling and associated work completed in FY 2023-24 is
highest since last 10 years of the exploration activities undertaken by the Company.
The Company has signed a Memorandum of Understanding (MoU) with Mineral
Exploration and Consultancy Limited (MECL) for a duration of three years to carry out
mineral exploration and allied works within its mining leases in the state of Jharkhand,
Madhya Pradesh, and Rajasthan on 25.8.2023. This MoU is facilitating in leveraging the
expertise of MECL in in-depth exploration for enhancing the resources /reserves in the
mining leases of HCL.
5. Significant or material orders passed by the Regulators or Courts or
Tribunals
No significant or material orders have been passed by the Regulators or
Courts or Tribunals impacting the going concern status and company's operations in future.
6. Utilization of funds raised through preferential allotment or QIP
during the year
The Company had raised funds of Rs 500 crore approx. in April, 2021
through Qualified Institutional Placement (QIP) for meeting expansion/Capex plan of the
Company by issuing 4,18,06,020 equity shares of face value of Rs 5/- each at a price of Rs
119.60 (including a premium of Rs 114.60) per share from institutional investors including
Mutual Funds, Banks, Insurance companies and FII's. The Company has utilized Rs 430.08
crore up to 31.3.2024. Funds raised through QIP has been utilized as per objects stated in
the QIP Document dated 12.4.2021.
7. Management Discussion and Analysis
A report on Management discussion and analysis of the performance of
the Company is given at Annexure-I.
8. Information in respect of Subsidiary, Associate and Joint Venture
Khanij Bidesh India Ltd (KABIL), a JV company between NALCO, HCL and
MECL, was incorporated on 8.8.2019 with the objective to identify, acquire, develop,
process and make commercial use of strategic and other minerals in overseas locations for
supply to India and boost "Make in India" campaign. The shareholding of NALCO,
HCL and MECL in KABIL is in the ratio of 40:30:30. During FY 2023-24 the Company invested
Rs 20.25 crore in KABIL. The cumulative investment of HCL in KABIL as on
31.3.2024 was Rs 30.00 crore (Net Rs 29.38 crore - refer Note No. 5 to
Financial Statement).
Chhattisgarh Copper Ltd, a JV company between HCL and Chhattisgarh
Mineral Development Corporation Ltd (CMDC), was incorporated on 21.5.2018 for exploration,
mining and beneficiation of copper and its associated minerals in the State of
Chhattisgarh. The total paid up capital of CCL as on 31.3.2024 is Rs 63.51 Lakh out of
which 74% equity is held by HCL and remaining 26% is held by CMDC. The cumulative
investment in CCL as on 31.3.2024 was Rs 47 lakhs (Net Rs 2.47 lakh - refer Note No. 5 to
Financial Statement).
Information in respect of Subsidiary, Associate & Joint Venture
(Form AOC 1) pursuant to Section 129(3) of the Companies Act, 2013 read with Rule 5 of
Companies (Accounts) Rules, 2014 is given in Notes to Financial Statements 2023-24.
9. Deposits
The Company has not taken any deposits covered under or which are not
in compliance with the requirements of Chapter V of the Companies Act, 2013.
10. Related Party Transactions (RPTs)
Detail of RPT in Form AOC-2 is given at Annexure - II. Policy on RPTs
and dealing with RPTs has been formulated and put up at the Company's website and can be
accessed at https:// www.hindustancopper.com/Content/PDF/Policy%20on%20 MRPT_RPT.pdf.
11. Maintenance of cost records
The Company is required to maintain cost records as specified by the
Central Government under section 148 of the Companies Act, 2013, and accordingly such
accounts and records are being maintained.
12. Name of companies which became and cease to be Subsidiaries, JVs or
Associate Companies
Nil during the year.
13. Establishment of Vigil mechanism
The Company has in place a Whistle Blower Policy which provide adequate
safeguards against victimization of employees / directors who avail of the mechanism and
also provide for direct access to the Chairman of the Audit Committee in exceptional
cases. The Policy has been hosted at the Company's website and can be accessed at
https://www.hindustancopper.com/Content/ PDF/Whistle_Blower_Policy.pdf.
14. Application made or any proceeding under the
Insolvency and Bankruptcy Code, 2016
Not applicable as no application has been made or proceeding pending
under the Insolvency and Bankruptcy Code, 2016.
15. Difference in valuation at the time of one-time settlement and
valuation while taking loan from the Banks or Financial Institutions
Not applicable as no one time settlement was done during the year.
16. Internal Complaints Committee under the Sexual Harassment of Women
at Workplace (Prevention, Prohibition and Redressal) Act, 2013
The Company has complied with the provisions relating to constitution
of Internal Complaints Committee under the Sexual Harassment of Women at Workplace
(Prevention, Prohibition and Redressal) Act, 2013. The Composition of the Internal
Complaints Committee is available at the website of the Company at
www.hindustancopper.com.
17. Risk Management Policy
The Board of Directors of the Company has developed and implemented a
Risk Management Policy for the Company including identification therein of elements of
risk, which in the opinion of the Board, may threaten the existence of the Company.
18. Dividend Distribution Policy
The Company has a Board approved Dividend Distribution Policy' in
place prepared in terms of Regulation 43A of SEBI (Listing Obligations and Disclosure
Requirements) Regulations, 2015 {SEBI (LODR), 2015}. The Policy is available at the
website of the Company and can be accessed at https://www.
hindustancopper.com/Content/PDF/Dividend_Distribution_Policy.pdf.
19. Internal Financial Controls
The Company has in place adequate internal financial control with
reference to financial statements commensurate with its size and operations.
20. Conservation of Energy, Technology Absorption, Foreign Exchange
Earnings and Outgo
Information on conservation of energy, technology absorption and
foreign exchange earnings and outgo stipulated under Section 134(3)(m) of the Companies
Act, 2013 read with Rule 8 of the Companies (Accounts) Rules, 2014, is given as
Annexure-III forming part of this report.
21. Safety & Environment
Mine Safety & Environment management remains the high priority area
of the Company. The Company is always aiming to achieve "Zero Accident"
potential and committed to continue sustainable mining by diligently adhering the
Sustainable Development Framework' stipulated by Indian Bureau of Mines (IBM),
Government of India.
The Company continues to maintain the tradition of achieving
recognition for its safety performance and, like previous years, this year also received a
number of awards in Annual Metalliferous Mine Safety Week under the aegis of respective
regional office of Director General of Mine Safety (DGMS), Government of India as detailed
below:
i. Malanjkhand Mine got 1st prize in VTC, First Aid & Electrical
equipment installation and 2nd prize in storage, transport & use of explosive and
overall underground mine.
ii. Khetri Mine got 1st prize in Electrical Installation & Winder
Machineries and 2nd prize in Mine Working, Plans, Records & Overall Performance.
Kolihan Mine in KCC also got 1st prize in VTC & Emergency Preparedness and 2nd prize
in Occupational Safety, Health Welfare & Publicity Propaganda.
iii. Surda Mine got 1st prize in drilling, blasting & safe handling
of explosives & statutory man power and 2nd prize in VTC & winding, underground
machineries, garage, plant & Equipment maintenance.
iv. Kendadih Mine got 2nd prize in implementation of SMP, SOP, PPE
& safety practice.
Similarly, in Annual Mine Environment & Mineral Conservation (MEMC)
Week of Indian Bureau of Mines (IBM), under the aegis of respective regional office of the
Government of India, Khetri Mine got 1st prize in environmental monitoring, and 3rd prize
in mineral conservation, publicity propaganda & overall underground mine performance.
Kolihan Mine got 2nd prize in publicity propaganda and 3rd prize in waste dump management.
Besides the above, special training, regular refresher training program
and on-the-job training are provided to all employees. Safety Campaigns like "Annual
Mines Safety Week", "Fire Services Day", "Fire services week" and
"Industrial Safety Day" celebrations are conducted regularly with active
participation of employees in all the Units of HCL.
22. Awards and Accolades
i. HCL has won the 35th Council for Fair Business Practices Jamnalal
Bajaj Award for fair business practices, period- 2022-23, in the category of Manufacturing
Enterprises- Large at Mumbai on 16.5.2023.
ii. HCL won "The ASSOCHAM Business Excellence Award for Smart
Waste Management Initiative" of the Year at the Indian Mining and Minerals Conclave
held in Kolkata on 30.6.2023.
iii. HCL was declared winner of Indian Institute of Metals (IIM)
Non-Ferrous Best Performance Award under the category of Large Integrated Manufacturing
Plant on 23.11.2023.
23. Corporate Social Responsibility (CSR)
The CSR Report in the prescribed format as per the Companies (Corporate
Social
Responsibility Policy) Rules, 2014 is at Annexure-IV.
Hon'ble Union Minister of Coal and Mines, Shri G Kishan Reddy, and
Minister of State of Coal and Mines, Shri Satish Chandra Dubey, in the presence of Shri
Ghanshyam Sharma, CMD, HCL, appreciate the products of the Women Self Help Groups at the
DMF gallery in Shastri Bhawan, New Delhi.
24. Vigilance Activities
During FY 2023-24, Vigilance department of Company had taken several
steps towards vigilance related activities and special attention given to preventive
vigilance measures. Various systemic improvement measures have been brought to the notice
of employees and efforts have being made to create more and more awareness amongst the
employees on regular basis. In HCL, online filling of Annual Property Return by all
executives of the Company has been completed within the target date of 31.1.2024. The
rotational transfer policy has been implemented and monitored for units/offices as guided
by CVC.
Training of vigilance officials and other officials were conducted
during 2023-24 to create awareness on various aspects and nuances of preventive vigilance
activities, capacity building as suggested by CVC and to fulfill organization need as
suggested by CVO on other side. The systemic improvement suggestions during outcome of
inspections of Contracts and procurement files were ensured to be circulated to the
concerned executives.
25. Official Language Implementation
During FY 2023-24, HCL made constant endeavor to increase the use of
Official Language Hindi in its Units/Offices. Hindi fortnight/Hindi week/ Hindi Diwas were
celebrated in the Units/ Offices of HCL from 14.9.2023 to 29.9.2023. On this occasion, the
messages of Hon'ble Home Minister, Hon'ble Mines Minister and CMD, HCL were
circulated/read out. Various competitions were organized with a view to increase interest
among employees towards the Official Language and winners were given awards on closing
ceremony held on 29.9.2023. Employees are constantly motivated to use Hindi in their
day-to-day official work. Hindi Workshops were conducted at Corporate Office,
Units/Offices at regular intervals. Regular review of progressive use of Hindi was carried
out in quarterly meetings of Official Language Implementation Committee under the
Chairmanship of CMD at Corporate Office and Unit Heads at Units.
During FY 2023-24, HCL participated in the half-yearly meetings
organized by the Town Official Language Implementation Committee (PSUs), Kolkata. HCL was
awarded Consolation Prize' in the category of Corporate Office for doing work in the
field of Official Language by CALTOLIC (Undertakings) on 31.01.2024.
The progressive use of Hindi is being reviewed regularly at Board
meetings. The Company's in-house journal "Tamralipi" is published in Hindi and
English languages and uploaded on the Company's website as a digital magazine. All
recruitment advertisements were given in bilingual. In order to increase knowledge and
popularity of Hindi among employees, the scheme of "One Hindi word and its usage in
sentence every day" was implemented. Notices etc. are uploaded on the Company's
website in Hindi and English.
26. Business Responsibility and Sustainability Report
Pursuant to Regulation 34 (2) of SEBI (LODR), 2015, Business
Responsibility and Sustainability Report for FY 2023-24 describing various initiatives
taken by the Company on social, environmental and governance perspective, is available at
the website of the Company and can be accessed at
https://hindustancopper.com/Content/PDF/Business%20
Responsibility%20and%20Sustainability%20Report%20 2023-24.pdf.
27. Annual Return
Annual Return pursuant to Section 92(3) of the Companies Act, 2013 is
available at the website of the Company and can be accessed at
https://hindustancopper.com/Content/Admin/ FlatFile/Annual_Return_2023-24.pdf.
28. Corporate Governance
Corporate Governance Report as per SEBI (LODR), 2015 is given at
Annexure-V forming part of this report together with Certificate on Corporate Governance.
29. Number of meetings of the Board
During 2023-24, ten Board meetings were held on 19.5.2023,10.7.2023,
11.7.2023, 29.7.2023, 14.8.2023, 10.11.2023,18.12.2023, 29.1.2024, 13.2.2024 and
28.3.2024.
30. Directors' Responsibility Statement
In terms of Section 134(5) of Companies Act, 2013, your Directors
confirm:
i. That in the preparation of the Annual Accounts for the year ended
31st March, 2023 the applicable Accounting Standards has been followed along with proper
explanations relating to material departures.
ii. That such Accounting Policies have been selected and applied
consistently and made adjustments and estimates which are reasonable and prudent so as to
give a true and fair view of the State of Affairs of the Company at the end of 31st March,
2024 and of the Profit and Loss of the Company for the FY 2023-24.
iii. That proper and sufficient care has been taken for the maintenance
of adequate accounting records in accordance with the provisions of the Act for
safeguarding the assets of the Company and for preventing and detecting fraud and other
irregularities.
iv. That the Directors have prepared the Annual Accounts on a going
concern basis.
v. That the Directors have laid down internal financial controls to be
followed by the Company and that such internal financial controls are adequate and
operating effectively.
vi. That the Directors have devised proper systems to ensure compliance
with the provisions of all applicable laws and that such systems are adequate and
operating effectively.
31. Declaration by Independent Directors
Independent Directors of the Company have given declaration to the
effect that they meet the criteria of independence as provided under Section 149(6) of the
Companies Act, 2013..
32. Familiarization Program for Independent Directors
On joining, Independent Directors are familiarized through induction
program / presentation with the overview of business, operations, new projects and
business model of the Company. Visit to Units is also organized as per their convenience.
They are also updated on the changes / developments including in the relevant statutory /
regulatory requirements from time-to-time. Detail of Directors' Training / Familiarization
Program has been hosted at the Company's website and can be accessed at https://
www.hindustancopper.com/Content/PDF/Fam_Pro_Ind_Dir.pdf.
33. Opinion of the Board with regard to integrity, expertise and
experience (including the proficiency) of the Independent Directors
In the opinion of Board, the Independent Directors of HCL are person of
integrity and possesses expertise and experience required to discharge their duty.
34. Manner of Annual evaluation of Board sub Committees and individual
Directors
HCL being a Government Company, performance evaluation of its Directors
and criteria of evaluation is decided and undertaken by the Government of India.
35. Code of Conduct
The Company has in place a Code of Conduct applicable to the Directors
as well as Senior Management and the same has been circulated to all concerned and posted
at the Company's website and can be accessed at https://www.hindustancopper.
com/Content/PDF/CC_Dir_Sr_Exe.pdf. All Board members and senior management personnel have
affirmed compliance of the Code for the year ended 31st March, 2024.
36. Directors and Key Managerial Personnel
During the year Shri Arun Kumar Shukla ceased to be Chairman and
Managing Director, HCL on attaining the age of superannuation on 31.7.2023.
Shri Ghanshyam Sharma, Director (Finance), HCL assumed additional
charge of the post of Chairman and Managing Director w.e.f. 1.8.2023 in terms of Ministry
of Mines' order No. Met.3-10/2/2022-METAL III-Part-(1) dated 31.7.2023 and 28.11.2023.
Shri Sharma will hold the additional charge until further orders by the Ministry.
Shri Rabindra Prasad Gupta, Director, Ministry of Mines (MoM) was
appointed as part time official (Govt. Nominee) Director vice Shri Sanjeev Verma,
Ex-Director, MoM with effect from 13.3.2024 in terms of MoM's order No. F No. 10/2/2002-
Met. III dated 13.3.2024 and his tenure will be until further orders by the Ministry.
The Board places on record its appreciation for the valuable services
and contribution made by S/Shri Arun Kumar Shukla and Sanjeev Verma during their tenure on
the Board.
37. Secretarial Audit Report
M/s S Basu & Associates, Practicing Company Secretaries, has been
appointed as Secretarial Auditor for FY 2023-24. Report given by the Secretarial Auditor
is given at Annexure -VI to this report. With regard to observations of Secretarial
Auditor about composition of the Board that "the Company did not have minimum
required 50% Independent Directors on its Board during the period from 1.4.2023 to
31.3.2024.", it is stated that HCL, being a Government Company and in terms of its
Articles of Association, appointment of all Directors on its Board is made by the
President of India through orders issued by the Ministry of Mines, Government of India.
The Company has no role to play in the appointment process. The Company has requested the
Ministry of Mines to fill up the vacant post of Directors.
38. Auditors
M/s. Ghoshal & Ghosal, Chartered Accountants, Kolkata was appointed
as Statutory Auditors to audit the accounts of the Company for the year 2023-24 by
Comptroller and Auditor General of India (C&AG).
M/s Chatterjee & Co., Kolkata was appointed as Cost Auditor of the
Company for carrying out the Cost Audit of the mines and plants of the Company in
accordance with the provisions of Section 148 of the Companies Act, 2013 and Companies
(Cost Records & Audit) Rules 2014 as amended from time to time for the year 2023-24.
39. Comments of C&AG
The comments of C&AG under the Companies Act on the accounts of the
Company for the year ended 31st March, 2024 are annexed to this report..
40. Other Events after Balance Sheet date
i) Reference Point No. 28 of Notes to the Standalone Financial
Statements' and No. 30 of Notes to the Consolidated Financial Statements'. In
continuation of the same, the Revisionary Authority, Ministry of Mines vide its Final
Order dated 05.08.2024 has set aside the demand notices and the matter has been remanded
back to the State Government with the direction to follow due process of law, re-examine
factual and legal issues, and provide proper opportunities of hearing to the Revisionist
before making any decision.
ii) There has been an accident in Kolihan Mines at Khetri, Rajasthan on
14.05.2024 which has resulted in stoppage of mining operations temporarily. This has led
to lower production of ore and MIC at Khetri Copper Complex.
41. Appreciation
In conclusion, your Directors wish to place on record their
appreciation of the hard work put in by all employees of the Company during the year under
review. The Board gratefully acknowledges the valuable guidance and co-operation received
from the Ministry of Mines and other Ministries/ Departments of the Government of India
and the support received from the State Governments of Rajasthan, Jharkhand, Madhya
Pradesh, Maharashtra, Gujarat and West Bengal and the Company's bankers, customers and
office bearers of the recognized Trade Unions of different Units / Head Office. The Board
also thanks all shareholders and investors for the trust reposed by them in the Company.
|
For and on behalf of the Board of Directors |
|
Sd/- |
|
Ghanshyam Sharma |
|
CMD [Addl. Charge] & |
Place : Kolkata |
Director (Finance) |
Date : 08.08.2024 |
(DIN-07090008) |
|